
Installation Instructions for 83KW/93KW–85KW/95KW IDH Max Cylindrical Locks
BEST ACCESS SYSTEMS
Indianapolis, Indiana
Installing the lock & through-bolt trim
14
16 Secure through-bolt trim and complete
connections
1 Position the inside and outside trim onto the door.
2 Making sure that the trim does not pinch the
wires, secure the trim to the door—but do not
tighten. Use the combination mounting screw at the
top trim hole and the standard mounting screw at the
bottom trim hole.
Caution: When routing the solenoid and sensor
wire harness, the sensor wires, and the solenoid
wires, make sure the wires are not routed across
any sharp edges or over any surface that could
damage their sleeving or wire insulation.
3 Make the three (3) sensor connections and solenoid
connection, and place the wires into the inside trim.
Caution: When making the sensor connections
and solenoid connection, make sure:
■ there are no loose wire connections where the
wires are inserted into the connectors
■ the connectors are firmly mated.
Wire connection Color
No. of
wires
No. of
pins
Solenoid Yellow 2 3
RQE Brn/Org 2 3
Shorting connection Purple 2 2
Door status sensor White 2 2
Figure 16 Securing the through-bolt trim and
completing connections
Combination
mounting screw
Standard
mounting screw
Make these
connections.
Inside of door
Inside trim
Komentáře k této Příručce